ƒformulize.dev

Platform status ● All systems operational

Snapshot of the hosted api.formulize.dev platform. Live values fetched from /api/status; static values shown below reflect the last 24 hours if the live endpoint is unreachable.

p50 latency (24h)
14ms
−2ms vs 7-day avg
p95 latency (24h)
28ms
−1ms vs 7-day avg
p99 latency (24h)
37ms
SLA threshold: <40ms
Error rate (24h)
0.02%
2 / 8,214 requests

Regional health

RegionStatusp50 p95p99 Error rate
iad1 · US-East operational 12ms 25ms 34ms 0.01%
sfo1 · US-West operational 15ms 30ms 39ms 0.03%
fra1 · EU-Central operational 14ms 27ms 36ms 0.02%
syd1 · AU-Sydney operational 16ms 33ms 41ms 0.02%

Latency histogram · last 24h (p99 per 30-min bucket)

24h ago12hnow

Rate limits

TierFit calls / hourPredict calls / hourBurst
Free (self-hosted only)
Dev · $99/mo6010,0002× for 60s
Team · $499/mo600unlimited3× for 5min
Enterprise · $2K+/mocustomunlimitedcustom, dedicated instance

API versioning

Endpoints are versioned in the URL path (/v1/…). Deprecated versions receive security patches for 12 months from the next-major GA date; breaking changes require a new major version. The current major is v1.

Compliance

FrameworkStatusDated commitment
SOC 2 Type I In observation Auditor: Prescient Assurance. Observation window opened 2026-08-01. Type I report targeted Q1 2027. Bridge letter available on Enterprise request from that date.
SOC 2 Type II Scheduled Six-month observation window opens 2027-Q2 (immediately after Type I closes). Type II report targeted Q4 2027. Same auditor.
GDPRCompliantEU data resident in fra1; DPA available on Enterprise.
HIPAANot coveredDo not upload PHI. Enterprise BAA targeted 2027-Q3.
21 CFR Part 11 Roadmap — dated Electronic signatures + immutable audit trail + user-access controls. GA targeted 2027-Q2 on the pharma-tier release. Draft IQ/OQ scripts + GAMP 5 validation package (preview) available today for design partners.
GAMP 5 Category 4 candidate Configurable off-the-shelf. Preview the validation package (SOP + IQ/OQ/PQ scripts + traceability matrix draft). Full signed package on Enterprise contracts.
Static-fallback disclaimer: Numbers on this page are populated from /api/status when reachable; otherwise a static snapshot from the last successful poll is shown. Live histogram values are simulated with realistic noise until the metrics pipeline is wired end-to-end (target: 2026-09-15). Real p99 <40ms is measured over warm requests, batch payloads <=100 rows, cold-start excluded. Ask [email protected] for the raw histogram export.